May 20, 2020

The Nosara Paradise Rentals team is progressive at a rapid pace. For instances there are the eaves of Casa Tranquilo, which have been sanded and varnished.

This is difficult and dangerous work, but these guys are up for the challenge.

Of course the main project right now is the construction of Casa Bianca. We framed up the window and door headers.

Soon we will commence the monster pour of the second story slab. These styrofoam blocks will be encased in the slab, which is essential to save weight and improves HVAC efficiency while muffling the footsteps of the upstairs neighbor.

Here you can see the final form fit for the ceiling slab here:

Stay tuned for this amazing feat, as every drop of concrete will be poured from above one wheelbarrow load at a time. Here is what the road to success looks like:

Meanwhile the preparations for Casa Bianca’s roof wood continues.

You gotta love the depth and variety of colors in this lumber.