Off Season Maintenance 2024

After a whirlwind three-month refit, we are ready to rock for the 2024 fishing season.

We got a ton of work finished just in time for the start of the season, including a big upgrade to our pool area.

The Nature Preserve campus is centered around the pool in the center of campus, and this year we decided to upgrade the surface area around the po0l:

Dieter led the charge on this massive tile job, and as always snuck a little artistic flair into the work:

Excellent work on this re-imagining of our beloved pool area.

 

Last  month we detailed the process of removing and repainting the rear transom bracket on the Wanderer, and this month we finished up the job on our mighty flagship.

The rest of the fleet is showing off fresh coats of gelcoat which has been polished to a high shine.

It is a great feeling to see the 2024 season spread out before us like a fruitful valley. Let’s get after it!